Software : Planning : Overview

Manufacturer : User Solutions, Inc

The objective of the model is to provide the master scheduler or planning function with a tool for determining the overall level of capacity and distribution of capacity required to meet demand. This demand can be driven by a forecasted incoming rate or consuming a backlog within a specified time frame for a particular cell - as well as for overall plant level. More specifically, the model:

Capacity balancing

Resource optimization

Runs with Excel

What-Ifs

Production Planning

Built in graphing

Integrates with any system

Source code included

How does It Work

Broadly speaking the cell model  data to be entered from the planner/master scheduler is entered in two tables and two tables only, Table A and Table 1. All other tables are calculated by the system from the data entered in Table A and Table 1 and should not have data entered. 

STEP 1 - LOAD TABLE 1

Table 1 is a list of  cell resources, work schedules and product family factors such as set up time and operation yield  and is documented  in a subsequent section of this document. Resources (work centers) should be entered in process sequence and every column should be filled out with a value.

STEP 2 - LOAD TABLE A

Forecasts or backlogs  can be loaded in either  sales dollars or units depending on how the  data is captured or available in your company. Forecasts in dollars must  eventually be translated into units  by estimating the  average selling price for that sales value and entering that data  in the EST SP field in Table A.. If the data is collected in units  then the "forecast/load " field in Table A should be entered in units and the estimated selling price field , "EST SP" should be entered as 1.00 . The period for which the forecast or backlog  corresponds should be entered in the  "PER(WKS)" field of Table A in weeks. The program will translate that sales or backlog value into units or pieces per month, week and day.

STEP 3 - EVALUATE  THE OUTPUT TABLES TABLE B , TABLE C AND TABLES 2. 3, 4

Table B  has the following information:

TABLE C  IS A SUMMARY TABLE AND HAS THE FOLLOWING  INFORMATION:

Results

Unit Demand vs Capicity

Staff Summary

One Shift Output (Good PCS)

More

More Screen

Order

For over 12 years User Solutions, Inc. has been the easy choice for thousands of companies worldwide.

Additional Information: Workcell Planner

Runs with Excel 97 or above

30-day money back guarantee!

Buy Online

bbuy.gif (1202 bytes)
$79.00

Home

Business Software

MS Excel Add-ins, Spreadsheets, Templates

Copyright © 1996-2005 IovSoft All Rights Reserved