Manufacturer : User Solutions, Inc
SKED1A schedules jobs for a single work station. This station can be independent of all other processing or it can be part of a manufacturing system so complex that the only option is to schedule each work station independently. In SKED1A, you can choose to minimize flow time, the number of jobs that are late, or the maximum time late for any job
SKED2A I is designed for flow shops of 2 work stations arranged in series. Each job receives exactly the same processing at each station. In such flow shops, there is no attempt to minimize lateness; instead, the objective is to minimize the total time needed to complete a batch of jobs.
SKED3A are designed for flow shops of 3 work stations arranged in series. Each job receives exactly the same processing at each station. In such flow shops, there is no attempt to minimize lateness; instead, the objective is to minimize the total time needed to complete a batch of jobs.In both SKED2A and SKED3A, there may be several alternative optimal solutions. Depending on how the jobs are sequenced before running the Ctrl Shift J macro, the worksheet may generate different sequences with the same makespan.
Desktop Home: http://www.busysoftorder.com